Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

https://www.figma.com/design/3cBb24JJG10LoUlY8v3FPA/Member-Agency?node-id=2318-398177&p=f&t=gmK1ildxfL5kQI0I-0

Test Case No

Test Description

Test Steps

Test Data

Expected Results

Actual Results

Status

Reference Ticket(s)

TC_01

Verify if the members receive the Annual Recommitment Reminder Email on the 2nd monday of January

 

 

All the active members must receive the email. Email template must be as per the design: https://www.figma.com/design/3cBb24JJG10LoUlY8v3FPA/Member-Agency?node-id=2318-398159&t=gmK1ildxfL5kQI0I-0

 

 

 

TC_02

Verify if member can go to the profile page from the email link ‘Go to My Dashboard’

click the link ‘Go to My Dashboard’

Member must be taken to the IDIR login page. On successful login, member must be navigated to the /profile page

TC_03

Verify if member can view the recommitment banner

Banner must appear op top of all the 3 tabs: Deployment & Availability, Profile Details and Training Courses

Banner must have following details:

  • Text: Confirm your recommitment status for the upcoming year. Please ensure that your profile details are up-to-date, before confirming your recommitment to CORE for 2025 by February 14, 2025.

  • Status: Not Started

  • Start Recommitment button

TC_04

For either BCWS & EMCR:

Verify if member can start the recommitment process

click the Start Recommitment button

For either BCWS & EMCR:

Step 1 of the recommitment process must be displayed. Buttons Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page.

Next button must be disabled until member can select an answer to the question: Do you want to return to EMCR CORE Team as a member for the upcoming 2025 year?*

Image Modified

TC_05

Verify if member is navigated to step 2 of recommitment process

Select yes from the drop down option in step 1 and click next

For EMCR:

Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page.

Previous btn must take member to step 1

The supervisor details must be pre-filled into the fields and member can edit them if needed

All the fields are mandatory field and user must not be able to move to the next step if atleast one is left empty

Image Modified

For BCWS:

Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Proceed must be available. Cancel button must cancel the process and navigate member to the home page.

Previous btn must take member to step 1

Image Added

Proceed button Starts the PAR-Q+ form from the beginning.

TC_

03TC_04

06

For BCWS only:

Verify if BCWS member can

go back and forth through the months of the calendar

A previous and next arrows must appear as a button.

Previous button must take member to previous months view. Eg: If having 3 months view, then on the click, previous 3 months from current month must be displayed.

Next button must take member to next months view. Eg: If having 3 months view, then on the click, next 3 months from current view must be displayed.

Jira Legacy
serverSystem Jira
serverIdd2911bf3-a8c8-34ad-879e-be57beeeb8f3
keyTC-854

TC_05

Verify if member can select the number of months to be displayed in the calendar

Month Range Dropdown Options:
1 month
3 months (default)
6 months

Member and coordinator/logistics view has one more option as 12 months, confirmed with Chevonne and its fine

TC_06

Verify if the scheduler is displayed

Scheduler must display in form of calendar.

Rows display the months and column displays the dates (1-30/31)

TC_07

Verify if the ”available” dates are displayed in the scheduler

For member: the ”available” dates should be white

For coordinator: the ”available” dates should be green

For logistics: the ”available” dates should be green

TC_08

Verify if the not valid dates such as Feb 29/leap year or April 31, June 31, Sep 31, Nov 31 are marked invalid

The listed dates must be blacked out and must not be available for member to add availability

TC_09

Verify if all dates are available by default

For members who have never committed before or have not added any availability yet, all the dates for all months must be displayed as available.

For member: the dates should be white

For coordinator: the dates should be green

For logistics: the dates should be green

TC_10

Verify if coordinator/logistics is able to filter and view the correct members as per the availability

Logistics & Coordinator must be able to use the Availability and availability date range filters. Members must display correctly

fill up the PARQ form

Click the Proceed button

ParQ form must appear in 3 steps

Step 1: 7 General questions on member’s health condition.

Next button:

Disabled until ALL 7 questions are answered.

If member answered one or more YES’s, clicking NEXT will move to Step 2 (follow-up) questions.

If member answered NO to all 7 questions, clicking NEXT will move to the final step of the PAR-Q+.

Step 2: 9 Follow-up questions on member’s health condition.

Question 1 must be Follow-up Question - Conditional Accordion:

If member answers YES to any of the follow-up questions, expanded to show sub-questions. If member answers NO, or question has not yet been answered, sub-questions will be hidden.

Next button: Disabled until the follow-up questions and subsequent questions are answered. Takes member to the final step (Participant Declaration) of the PAR-Q+ form.

Step 3:

Signature Field, Date Field, Witness Name Field: Member is required to sign their name, the date and indicate the witness name to complete the PAR-Q+ process.

DOWNLOAD RESPONSE Button: Downloads a PDF copy of their completed PAR-Q+ to their computer.

COMPLETE AND PROCEED Button: Disabled until the signature, date and witness field is filled AND the Download Response button is clicked.

Clicking the Complete and Proceed button brings member back to the main recommitment modal, and they will no longer go back to retrieve a copy of their PAR-Q+.

TC_07

Verify if member is navigated to step 3 of recommitment process

For BCWS click the Complete and Proceed button,

For EMCR click the Next button

For BCWS:

Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page.

Previous btn must take member to step 1

The supervisor details must be pre-filled into the fields and member can edit them if needed

All the fields are mandatory field and user must not be able to move to the next step if at least one is left empty

Image Added

For EMCR:

Image Added

Submit Decision button must navigate member to the profile page. Recommitment banner must be:

Image Added

Jira Legacy
serverSystem Jira
serverIdd2911bf3-a8c8-34ad-879e-be57beeeb8f3
keyTC-854

TC_08

For BCWS only:

Verify if member is navigated to step 4 of recommitment process

Click Next

Image Added

Submit Decision button must navigate member to the profile page. Recommitment banner must be:

Image Added

Test Scenario ID: TS_02

Test Scenario: Verify the member recommitment process for an active member returning to either of the one program

Prerequisites: Member must be active