Test Case No | Test Description | Test Steps | Test Data | Expected Results | Actual Results | Status | Reference Ticket(s) |
TC_01 | Verify if the members receive the Annual Recommitment Reminder Email on the 2nd monday of January |
|
| All the active members must receive the email. Email template must be as per the design: https://www.figma.com/design/3cBb24JJG10LoUlY8v3FPA/Member-Agency?node-id=2318-398159&t=gmK1ildxfL5kQI0I-0 |
|
|
|
TC_02 | Verify if member can go to the profile page from the email link ‘Go to My Dashboard’ | click the link ‘Go to My Dashboard’ | Member must be taken to the IDIR login page. On successful login, member must be navigated to the /profile page | ||||
TC_03 | Verify if member can view the recommitment banner | Banner must appear op top of all the 3 tabs: Deployment & Availability, Profile Details and Training Courses Banner must have following details:
| |||||
TC_04 | For either BCWS & EMCR: Verify if member can start the recommitment process | click the Start Recommitment button | For either BCWS & EMCR: Step 1 of the recommitment process must be displayed. Buttons Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page. Next button must be disabled until member can select an answer to the question: Do you want to return to EMCR CORE Team as a member for the upcoming 2025 year?* | ||||
TC_05 | Verify if member is navigated to step 2 of recommitment process | Select yes from the drop down option in step 1 and click next | For EMCR: Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page. Previous btn must take member to step 1 The supervisor details must be pre-filled into the fields and member can edit them if needed All the fields are mandatory field and user must not be able to move to the next step if atleast one is left empty For BCWS: Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Proceed must be available. Cancel button must cancel the process and navigate member to the home page. Previous btn must take member to step 1 Proceed button Starts the PAR-Q+ form from the beginning. | ||||
TC_ |
06 | For BCWS only: Verify if BCWS member can |
A previous and next arrows must appear as a button.
Previous button must take member to previous months view. Eg: If having 3 months view, then on the click, previous 3 months from current month must be displayed.
Next button must take member to next months view. Eg: If having 3 months view, then on the click, next 3 months from current view must be displayed.
Jira Legacy | ||||||
---|---|---|---|---|---|---|
|
TC_05
Verify if member can select the number of months to be displayed in the calendar
Month Range Dropdown Options:
1 month
3 months (default)
6 months
Member and coordinator/logistics view has one more option as 12 months, confirmed with Chevonne and its fine
TC_06
Verify if the scheduler is displayed
Scheduler must display in form of calendar.
Rows display the months and column displays the dates (1-30/31)
TC_07
Verify if the ”available” dates are displayed in the scheduler
For member: the ”available” dates should be white
For coordinator: the ”available” dates should be green
For logistics: the ”available” dates should be green
TC_08
Verify if the not valid dates such as Feb 29/leap year or April 31, June 31, Sep 31, Nov 31 are marked invalid
The listed dates must be blacked out and must not be available for member to add availability
TC_09
Verify if all dates are available by default
For members who have never committed before or have not added any availability yet, all the dates for all months must be displayed as available.
For member: the dates should be white
For coordinator: the dates should be green
For logistics: the dates should be green
TC_10
Verify if coordinator/logistics is able to filter and view the correct members as per the availability
fill up the PARQ form | Click the Proceed button | ParQ form must appear in 3 steps Step 1: 7 General questions on member’s health condition. Next button: Disabled until ALL 7 questions are answered. If member answered one or more YES’s, clicking NEXT will move to Step 2 (follow-up) questions. If member answered NO to all 7 questions, clicking NEXT will move to the final step of the PAR-Q+. Step 2: 9 Follow-up questions on member’s health condition. Question 1 must be Follow-up Question - Conditional Accordion: If member answers YES to any of the follow-up questions, expanded to show sub-questions. If member answers NO, or question has not yet been answered, sub-questions will be hidden. Next button: Disabled until the follow-up questions and subsequent questions are answered. Takes member to the final step (Participant Declaration) of the PAR-Q+ form. Step 3: Signature Field, Date Field, Witness Name Field: Member is required to sign their name, the date and indicate the witness name to complete the PAR-Q+ process. DOWNLOAD RESPONSE Button: Downloads a PDF copy of their completed PAR-Q+ to their computer. COMPLETE AND PROCEED Button: Disabled until the signature, date and witness field is filled AND the Download Response button is clicked. Clicking the Complete and Proceed button brings member back to the main recommitment modal, and they will no longer go back to retrieve a copy of their PAR-Q+. | |||||||||||||
TC_07 | Verify if member is navigated to step 3 of recommitment process | For BCWS click the Complete and Proceed button, For EMCR click the Next button | For BCWS: Step 2 of the recommitment process must be displayed. Buttons Previous, Cancel & Next must be available. Cancel button must cancel the process and navigate member to the home page. Previous btn must take member to step 1 The supervisor details must be pre-filled into the fields and member can edit them if needed All the fields are mandatory field and user must not be able to move to the next step if at least one is left empty For EMCR: Submit Decision button must navigate member to the profile page. Recommitment banner must be: |
| |||||||||||
TC_08 | For BCWS only: Verify if member is navigated to step 4 of recommitment process | Click Next | Submit Decision button must navigate member to the profile page. Recommitment banner must be: |
Test Scenario ID: TS_02
Test Scenario: Verify the member recommitment process for an active member returning to either of the one program
Prerequisites: Member must be active